Detajet e projektit
- Sektori
- Water & Hydraulic Infrastructure
- Statusi
- Studimi i fizibilitetit i përfunduar
- Periudha
- 2025-2025
- Vlera e investimit
- Not Disclosed
- Vendndodhje
- Ersekë, Kolonjë
- Lloji i infrastrukturës
- Riverbank Protection & Hydraulic Erosion Control
- Observed Riverbank Retreat
- Approximately 20–32 m over 16 years
- Channel Incision Depth
- Up to Approximately 10 m
- Maximum Modelled Flow Velocity
- Approximately 10–11 m/s
- Recommended Solution
- Integrated Flow-Energy Reduction, Embankment and Riverbank Protection