- Lloji i hidrocentralit
- Reservoir-Based Hydropower with River Diversion
- Original Construction
- 1970s
- Kapaciteti i instaluar
- 2.9 MW
- Lumi / rrjedha ujore
- Osum River – Leshnjë Intake
- Reservoir
- Gjanç Reservoir
- Reservoir Storage Capacity
- Approximately 18 million m³
- Number of Main Reservoir Dams
- 2
- Dam Construction Type
- Earthfill Embankment Dams
- Gjanç 1 – Dam Height
- 30 m
- Gjanç 1 – Crest Length
- 210 m
- Gjanç 2 – Dam Height
- 29 m
- Gjanç 2 – Crest Length
- 150 m
- Diversion Canal Length
- Approximately 6.1 km of assessed canal sections
- Debiti i projektimit
- 3.0 m³/s
- Rënia neto hidraulike
- 117 m
- Main Intake Weir
- Existing Concrete Diversion Weir
- Hydraulic Crossings
- 2 Steel Siphons and Canal Bridge
- Main Assets Assessed
- Intake Weir, Diversion Canal, Siphons, Canal Bridges, Reservoir and Dams
- Energjia e prodhuar në vit
- 11,430 MWh/Year
- Design Capacity Factor
- 45%