- Project Type
- Rehabilitation, Modernization & Capacity Upgrade
- Original Construction
- 1980s
- Lloji i hidrocentralit
- Existing Run-of-River / Diversion Hydropower
- Kapaciteti i instaluar
- 1.95 MW
- Numri i turbinave
- 3
- Turbine Configuration
- Pelton and Francis
- High-Head Intake Elevation
- 878 m asl
- High-Head Intake Elevation
- 0.300 m³/s
- Low-Head Intake Elevation
- 520 m asl
- Low-Head Design Discharge
- 2.562 m³/s
- Rënia neto hidraulike
- 60 m / 408 m
- Energjia e prodhuar në vit
- 5,350 MWh/Year