- Hydropower Plant Type
- Run-of-River / Diversion
- Installed capacity
- 1.00 MW
- Number of Turbines
- 2
- Installed Capacity per Turbine
- 1 × 400 kW + 1 × 600 kW
- River / Watercourse
- Celi I Selces
- Design Discharge
- 3.30 m³/s
- Net Hydraulic Head
- 34.25 m
- Water Intake Structure
- Concrete Gravity Weir
- Intake Weir Height
- Approximately 4.0 m
- Water Conveyance System
- Reinforced-Concrete Diversion Channels and Steel Penstock
- Penstock Length
- 435 m
- Energy produced per year
- 4,080 MWh/Year