- Hydropower Plant Type
- Run-of-River / Diversion
- Installed capacity
- 2.00 MW
- Number of Turbines
- 3
- Installed Capacity per Turbine
- 670 kw
- River / Watercourse
- Celi I Selces
- Design Discharge
- 3.30 m³/s
- Net Hydraulic Head
- 71 m
- Water Intake Structure
- Concrete Gravity Weir
- Intake Weir Height
- Approximately 4.0 m
- Water Conveyance System
- Pressure Penstock
- Penstock Length
- 2,200 m
- Energy produced per year
- 8,201 MWh/Year