- Hydropower Plant Type
- Run-of-River / Diversion
- Installed capacity
- 2.00 MW
- Number of Turbines
- 2 Pelton
- Turbine Configuration
- 1 × 1,300 kW + 1 × 700 kW
- River / Watercourse
- Rehovë Stream – Kardhiq River Basin
- Design Discharge
- 0.85 m³/s
- Net Hydraulic Head
- 275.36 m
- Main Water Intake Structure
- Tyrolean-Type Concrete Gravity Weir
- Additional Water Intake
- Existing Kolonjë Spring Catchment
- Intake Weir Height
- Approximately 3.0 m
- Water Conveyance System
- Polyethylene Diversion Pipelines and Steel Penstock
- Penstock Length
- 2,392 m
- Energy produced per year
- 5,350 MWh/Year