- Project Type
- Rehabilitation, Modernization & Capacity Upgrade
- Original Construction
- 1980s
- Hydropower Plant Type
- Existing Run-of-River / Diversion Hydropower
- Installed capacity
- 1.95 MW
- Number of Turbines
- 3
- Turbine Configuration
- Pelton and Francis
- High-Head Intake Elevation
- 878 m asl
- High-Head Intake Elevation
- 0.300 m³/s
- Low-Head Intake Elevation
- 520 m asl
- Low-Head Design Discharge
- 2.562 m³/s
- Net Hydraulic Head
- 60 m / 408 m
- Energy produced per year
- 5,350 MWh/Year