- Installed capacity
- 300 MW
- Number of Wind Turbine Generators
- 50 units
- Wind Turbine Model
- GE Renewable Energy 6.0-164
- Wind Turbine Foundation Type
- Reinforced-concrete gravity foundations with engineered backfill and grounding system
- Expected Annual Energy Production
- Approximately 940,056 MWh/year
- Total Project Area
- Approximately 4,000 hectares
- Expected Capacity Factor
- Approximately 35.77%
- Mounting System
- Tubular/hybrid wind-turbine towers with reinforced-concrete foundations
- Rated Capacity per Turbine
- 6.0 MW
- Rotor Diameter
- 164 m
- Hub Height
- 167 m
- Average Wind Speed at Hub Height
- Approximately 7.5 m/s
- Internal Electrical Collection System
- 35 kV underground medium-voltage cable network
- Substation
- 400/35 kV wind-farm substation
- Grid Connection Voltage
- 400 kV
- Transmission Line Length
- Approximately 12.8 km
- Access Roads
- Approximately 50 km of internal roads and turbine access tracks
- Meteorological Masts / LiDAR Units
- 1 LiDAR unit recommended; final monitoring arrangement to be confirmed