- Hydropower Plant Type
- Run-of-River / Diversion
- Installed capacity
- 770 kW
- Number of Turbines
- 2 Pelton
- Installed Capacity per Turbine
- 2 x 385 kW
- River / Watercourse
- Vomesit Stream – Gjadër River Basin
- Design Discharge
- 0.68 m³/s
- Net Hydraulic Head
- 133.80 m
- Main Water Intake Structure
- Earthfill Dam – Approximately 14 m
- Concrete spillway length
- 20 m
- Secondary Intake Structure
- Tyrolean-Type Concrete Weir Approximately 3.0 m
- Siphon Length
- 420 m
- Diversion Canal Length
- 2,000 m
- Penstock Length
- 640 m
- Energy produced per year
- 1,596 MWh/Year