- Hydropower Plant Type
- Run-of-River / Diversion
- Installed capacity
- 1.6 MW
- Number of Turbines
- 2 Francis
- Turbine Configuration
- 1 × 1,000 kW + 1 × 600 kW
- River / Watercourse
- Cem i Vuklit
- Design Discharge
- 4.3 m³/s
- Net Hydraulic Head
- 41.86 m
- Water Intake Structure
- Concrete Gravity Weir with Side Intake
- Intake Weir Height
- Approximately 4.0 m
- Water Conveyance System
- Steel Pressure Penstock
- Penstock Length
- 1,700 m
- Energy produced per year
- 5,770 MWh/Year
- Design Capacity Factor
- 41%