- Project Type
- Rehabilitation, Modernization & Capacity Upgrade
- Original Construction
- 1970s–1980s
- Hydropower Plant Type
- Existing Run-of-River / Diversion Hydropower
- Installed capacity
- 1.5 MW
- Number of Turbines
- 2 Francis
- Turbine Configuration
- 2 x 750 kW
- River / Watercourse
- Cem i Vuklit
- Design Discharge
- 4.5 m³/s
- Net Hydraulic Head
- 42.15 m
- Water Intake Structure
- Side Intake with Concrete Weir
- Intake Weir Height
- Approximately 5.0 m
- Water Conveyance System
- Steel Pressure Penstock
- Penstock Length
- 2,450 m
- Energy produced per year
- 5,769 MWh/Year