- Hydropower Plant Type
- Run-of-River / Diversion
- Installed capacity
- 1.30 MW
- Number of Turbines
- 2 Francis
- Installed Capacity per Turbine
- 2 x 650 kW
- River / Watercourse
- Dishnica Stream
- Design Discharge
- 5.5 m³/s
- Net Hydraulic Head
- 28.67 m
- Water Intake Structure
- Rehabilitation of Existing Concrete Weir and Side Intake
- Water Conveyance System
- Rehabilitated Irrigation / Diversion Canal
- Diversion Canal Length
- 2,500 m
- Penstock Length
- 180 m
- Energy produced per year
- 3,849 MWh/Year
- Design Capacity Factor
- 34%